First Crossrail tracks laid
Published: Thu, 2014-11-27 09:00The first section of track to be used by Crossrail trains has been laid on a new bridge in west London. The 120 metre long Stockley Flyover will be used by Heathrow Express and Heathrow Connect services from next year and is the largest single span bridge to have been installed anywhere on the Great Western railway since the days of Brunel. It will ensure that services heading towards central London will be able to join the Great Western Main Line without delaying, or being delayed, by other trains using the route.
Matthew White, Surface Director at Crossrail said: “Installing the first section of Crossrail track is a major milestone for the project. The flyover at Stockley will provide a vital new link between Heathrow and London, significantly improving connections between the airport and the West End, the City and Canary Wharf.”
Crossrail services between London Paddington and Heathrow will begin in 2018. From 2019, the full route will open, allowing passengers to travel from Heathrow right through the centre of the capital without changing trains. Up to four Crossrail trains an hour will link Heathrow with central London and beyond. Passengers will be able to reach Bond Street in 26 minutes and Canary Wharf in 40 minutes.